Bergen Point Wastewater Treatment Plant Expansion And Upgrade

Once the testing was approved, the entire system was balanced and placed into operation. Open Location Code87G8MMF5+96. Localities in the Area. 5 million, and the payback will be relatively short. "In far too many communities, critical water infrastructure has been left to fall into disrepair, but here in New York we are taking action to protect the health and well-being of New Yorkers, " Governor Kathy Hochul said. The system has been upgraded to a more modern design requiring only a single open channel to disinfect plant wastewater. The grants and low-cost financing packages, approved by the New York State Environmental Facilities Corporation, will support water infrastructure projects that cost a total of more than $763 million. The project includes the construction of a 14, 200-ft, 120-in. 6 million package will fund improvements to Suffolk County's Bergen Point wastewater treatment plant outfall pumping system. Suffolk County - $81, 624, 796 in long-term, interest-free financing to replace the effluent outfall that extends from the Bergen Point Wastewater Treatment Plant to the Jones Beach barrier island beneath the Great South Bay. Suffolk County Sewer District no.

Stevens Point Wastewater Treatment Plant

The second project will be more extensive, and more beneficial. Construction included installation of ten new belt presses, a new instrumentation/control system, all new pumps, tanks, odor control system, security system, truck loading area with conveyors and pricing. 3 million from Suffolk County bonds and $510, 000 in municipal contributions. 8 million SMLP grant and US$58. 5 million through Community Development Block Grant Disaster Recovery Program (CDBG-DR) from the Department of Housing & Urban Development (HUD) and US$37. I am pleased that EFC has prioritized and approved a loan for this important project; it is just the type of mitigation project we had in mind when crafting the Sandy Relief Bill. Copyright © 2018 de Bruin Engineering - All Rights. Installation of bypass pumping facility and appurtenances preceded the demolition of the facilities. 5 million in no-interest loans and US$157 million in low-interest loans from the New York State Environmental Facilities Corporation (EFC) to reduce the cost impact of the project to sewer district residents. Freezing is now complete and overall, the project has been a significant success. Through thorough analysis and planning, as well as systematic communication with all stakeholders including Suffolk County DPW, the project engineers and its JV partner Skanska, Posillico was successful in integrating the new equipment and systems to the existing infrastructure and getting the upgraded WWTP to operate as intended. Dewatering system was installed during construction. West Babylon residents are raising a stink at a proposed incinerator at the Bergen Point sewage treatment plant.

Bergen Point Sewage Treatment Plant

Construction of a tunnel2. Daniel J "Fuzzy" Cor-i-ca. Information about a product or service. Click to add text... The experienced and qualified people we have at Keller are second to none, and work of this complexity simply couldn't be done without them. This treatment destroys any microorganisms without the addition of chlorine to the stream. The impact extends beyond Bergen Point: "Somebody is producing those chemicals and transporting it to us. The final effluent pump station facility went into operation over 30 years ago and it is essential that the redundancy and service life of the facility is extended. The two main collection system trunk sewers merge at the wastewater treatment plant in Waldwick.

Bergen Point Wastewater Treatment Plant Blog

Atlanta, GA. Atlantic City, NJ. De Bruin provided construction inspection and scheduling for the replacement of deteriorated and leaking piping of the hot and chilled water distribution piping system with a new fiberglass insulated piping system that enters and exits cast in place structures throughout the facility. If too little air is introduced into the aeration tanks, the biomass will use anaerobic respiration to metabolize the organic matter, producing foul odors and poor effluent quality. The New York Power Authority in 2009 launched a program to reduce energy demand from water and wastewater treatment plants by about 20 percent by 2015.

Post Point Wastewater Treatment Plant

Rehabilitation of 8 aeration tanks. We're going to save money, and it's safer for the environment. A Team That's Second to None. The County will receive $13. New belt filter presses (Ashbrook) have increased the solids content from 22 percent to nearly 30 percent. Next up, and still in the planning stage, is the second-phase project.

Bergen Point Wastewater Treatment Plant And Animal

Installation absorption chillers6. Local governments can learn more and apply at. A Highly Efficient Design. The overflow stream from the final clarifiers flows by gravity to the UV disinfection system. This was coupled with a model that included groundwater flow to evaluate the effects on the formation of the frozen earth wall. "The payback is pretty good for us, and we haven't even put a dollar figure on what we're doing to help the environment, " Wright says. People also search for. Although some grit may be discharged to the sewer system by users, most grit is washed into the system along with groundwater infiltration. A 4-MW unit would power the entire plant.

Wastewater Treatment Plants Nj

Drawing on the multi-disciplined technical resources within our business, we step outside the conventions of traditional problem solving, and seek new ways to improve electrical infrastructure design through smart electronics, intelligent data gathering, and operational networking and control. Return to Projects List. First phase of a four phase road restoration project aimed to improve pavement conditions throughout the Town. The dewatering project cost $5 million, but it saves $1 million a year in trucking costs. Your financial references. W. Babylon residents raise stink over proposed sewage treatment incinerator. Here the wastewater flowing through open channels is exposed to ultraviolet light produced by lamps suspended in the channels. The pipes were then used to circulate a calcium chloride brine, chilled to -30ºC to an exact flow rate for six weeks. Lindenhurst is a village in Suffolk County, New York, United States, on the southern shore of Long Island in the town of Babylon. The wastewater flows into the primary settling tanks where the flow velocity is reduced and the suspended material is allowed to settle to the bottom of the tanks.

Bergen Point Wastewater Treatment Plant

The staff has already reduced chemical use by about 1, 500 pounds per day. To achieve this, we work in partnership with our customers, lending our electrical engineering expertise to their operational challenges. Sufficient air must be provided to supply the biomass with the oxygen necessary for respiration. The remaining effluent, which by this point in the process appears quite clear, is ready to be disinfected and discharged. Wastewater and drinking water facilities impacted by Superstorm Sandy in 14 New York State counties are eligible for the program's funding, including Bronx, Greene, King, Nassau, New York, Orange, Putnam, Queens, Richmond, Rockland, Suffolk, Sullivan, Ulster and Westchester counties. Addition of 4 settling tanks and 4 aeration tanks. The approvals include financings through the Clean Water State Revolving Fund and Drinking Water State Revolving Fund (DWSRF) and grants already announced pursuant to the Water Infrastructure Improvement (WIIA) program. "Great place to work installing an outflow pipe for recycled water foot underground. Our responsibilities included project engineering, construction inspection, conducting foreman's and project meetings, negotiation of change orders, project estimate, contractor claims evaluation, preliminary review of RFI's, shop witness testing, blue tag/yellow tag and system startup and scheduling. 32km outfall pipeline with 120-inch dia 4.

4 million that includes US$16. After successfully completing the launch shaft in the second half of 2018, Keller returned in November of last year to carry out the same work for the 102-ft deep, 30-ft ID receiving shaft. Primary settling is merely a physical separation of solids from the wastewater. The dewatered sludge is sent to the fluid bed incinerator where combustion at greater than 1500 ºF destroys all organic material.

The construction cost will be about $1. On March 2, 2017, tender was issued for the procurement of contractor to replace the outfall pipe with the submission deadline as May 4, 2017 and bid Opening date is June 8, July 2017, a joint venture formed by OHL, Posillico and SELI Overseas won the construction contract. 4 million in no-interest financing for Suffolk County, which was approved today by the Environmental Facilities Corporation's Board of Directors. In total, 49 pipes were installed into precisely drilled and aligned holes on 3-ft centers around the perimeter of the launch shaft, with nine in the middle, to depths of 150 ft. Posillico was able to limit the schedule impact brought on by design adjustments by completely resequencing the job and pushing out certain items of work. Motors across the plant were also changed out.